Complete Plant including Condor® Dryer – En Nour (Algeria) – 2016

Home » Projects » Complete Plant including Condor® Dryer – En Nour (Algeria) – 2016

Complete Plant including Condor® Dryer – En Nour (Algeria) – 2016

Capaccioli  delivered a new 600 ton / day plant to Briqueterie Nour in Tlemcen for the production of perforated and thermal wall blocks.

This is the first time that a complete plant in Algeria has included the revolutionary Condor® dryer known for its low energy consumption, low initial investment costs and the ability to produce many types of bricks, perforated and wall blocks.

The plant will be able to produce, in addition to the usual B8 and B12 products, a range of innovative thermal blocks. In addition to the Condor® dryer, the supply is completed by the cutting and loading line, the robotic stacker and the unloading line for the fired material, as well as the double line robotic packaging.